-
Hock Exhibits at 2016 Asia Regional Conference on Geosynthetics
2016 Asia Regional Conference on Geosynthetics organized by IGS Indian Chapter was open from 8 to 11, November, 2016 at Indian capital-Delhi. International sales team from Hock Technology participated in this big event. We emphasized on the ...
2016-11-17 -
HOCK successful participation to the GeoAmericas 2016
HOCKs international sales team under the leadership of the Vice-President Mr. Li Zhao, attended the GeoAmericas 2016 (3rd Pan-American Conference on Geosynthetics) which was held from 10th to 13rd April 2016 co-locating with NAGS in Miami B ...
2016-04-15 -
HOCK Will Attend GeoAmericas 2016
HOCK will attend GeoAmericas 2016 to be held at Loews Miaminbsp;Beach from 10-13 April 2016. Our Booth #105 - HOCK Technology Co., Ltd. GeoAmericas 2016 is hosted by the North American Geosynthetics Society (NAGS) and is the most profession ...
2016-03-16 -
We had a technological exchange with Power China Chengdu Engineering Corporation Limited
Recently, we had a technological exchange with the directors and designers of Power China Chengdu Engineering Corporation Limited at Chengdu. The directors of Chengdu Engineeting Corporation Limited introduced theit core technological advan ...
2015-05-28 -
One coal mine in Shanxi Province used independently the flexible mining grid for moves of hydraulic s
In order to improve the technological level of the longwall moves, effectively save the cost and change the situation that the longwall moves are always done by one professional longwall moves company, one state-owned coal mine in Shanxi pr ...
2015-05-27 -
The mechnized mining team made the new record on the moves of hydraulic shields under the assitance o
The morning shift and the middle shift moved 10 shields per shift at the longwall recovery of F31311 LW. This was the best record on moving the shields in one shift of this coal mine. The mining grid guaranteed the safety and speed of the s ...
2015-05-26 -
Breakthrough on the innovation in the hanging, installing of mining grid
Recently, 4526 longwall of one coal mine in Inner Mongolia implemented with success the new technology of using winches to hang the mining grid which not only shortened the installation, but also saved the labour, with safer operation. Sinc ...
2015-05-05 -
Our mining grid was used sucessfully in a high longwall at Shanxi Province
In 28th, March, the 5103 longwall of one big coal industry group at Shanxi Province finally cut out safely. 5103 fully mechnized longwall is situated in No.1 panel of 52 coal layer with 250m long. The two gateways were arranged along the co ...
2015-05-04 -
Deputy Mayor of Jining Mr. Bai Shan came to our company for the research on technological innovation
8th, April afternoon, the Deputy Mayor of Jining, Secretary of High-tech Zone Party Committee - Mr. Bai Shan came to us for research and investigated and guided on the company development, industrial orientation, technological cooperation a ...
2015-05-03 -
The technology of applying mining grid for the safe and efficient recovery of the fully mechnized lon
Lots of coal mines have accumulated experiences on applying the mining grid for the safe and efficient recovery of the fully mechnized longwall. Through our active communication with the editor-in-chief and publisher, the mining grid techno ...
2015-05-02